On this page (4 sections)
Kit 3 · 7-Sheet Microsoft Excel Pack · Version 2026.3 (November 2026)
A reusable Microsoft Excel toolkit for documenting supplier assumptions consistently, comparing 10-year lifecycle electricity and overhaul costs at your site tariff, and preparing an auditable capital approval case.
1. Who This Workbook Is For & the Decision It Supports
Built for procurement engineers, project managers, operations managers, and finance leads evaluating industrial rotary screw, VSD, or oil-free compressor proposals (typically 15 kW to 250 kW+). Because electricity represents roughly 70 to 80% of 10-year compressor ownership cost, comparing brochure motor kW or upfront purchase price alone frequently leads to selecting the more expensive machine over its operating life.
2. Sample Sheet Previews (Click Any Image to Enlarge)
Static sample renders from the 7-sheet populated Australian capex workbook. Your download includes both this worked reference file and a clean blank production workbook.
3. Complete 7-Sheet Workbook Contents
| Sheet # | Worksheet Name | Procurement / Financial Purpose |
|---|---|---|
| Sheet 1 | 0. Start Here & Guide | Procurement evaluation workflow, editable input guide, ISO 1217 Annex C/E data checklist, and scope boundaries. |
| Sheet 2 | 1. CFO Capex Dashboard | 1-page A4 landscape capital approval summary displaying Capex, Year 1 & 10-Year Opex, Net Present Value (NPV), Internal Rate of Return (IRR), and payback. |
| Sheet 3 | 2. Plant Demand & Sizing | Editable plant duty inputs (flow in L/s & CFM, target pressure, shift hours, excess bar penalty) so lifecycle formulas reflect your actual site load. |
| Sheet 4 | 3. 10-Yr NPV & Cashflow | Year 0 to Year 10 discounted cashflow schedule incorporating $0.30/kWh base tariff (editable), annual escalation, scheduled service, Year 4/8 airend overhauls, and NSW ESS / VIC VEU certificate offsets. |
| Sheet 5 | 4. 2-Way Sensitivity | Dynamic 2-way matrix testing annual savings and payback across electricity tariffs ($0.22 to $0.38/kWh) vs operating hours (2,000 to 8,760 h/yr). |
| Sheet 6 | 5. 5-Vendor ISO 1217 Scorer | Side-by-side comparison for Quotes A to E normalising delivered package FAD, specific power (kW/m³/min), turnkey exclusions, 45 °C ambient guarantee, and AS 1210 receiver MDR documentation. |
| Sheet 7 | 6. 45 C Commissioning | Pre-handover site acceptance checklist covering ventilation ducting, zero-loss drains, oil-water trade waste, PRV certificates, and baseline kW/FAD logging. |
4. Practical Boundaries & Reliance Limits
- Decision-support model, not site demand logging or financial advice: Modelled savings depend on the duty profile, electricity tariff, and supplier data you enter. For major capital replacements with uncertain shift variation, 7 to 14 days of physical
ISO 11011:2013kW and flow logging is recommended prior to contract award. State energy certificate eligibility (NSW ESS / VIC VEU) must be confirmed with an Accredited Certificate Provider before equipment order. - Small workshop replacement? If you are replacing a small intermittent workshop piston or 7.5 kW unit, our free Compressor Sizing Calculator and 2026 Price Guide are usually sufficient without buying a formal tender workbook.
Purchase Kit 3 (Instant Download)
Includes Clean Blank .xlsx, Worked AU Capex .xlsx (7 sheets each), and Vendor-Neutral RFQ PDF with a FirmOS Pty Ltd GST tax invoice.
Want Vetted Multi-Brand Proposals or an ISO 11011 Audit?
Free 1-to-1 introduction to an independent Australian multi-brand compressor specialist or energy auditor (Direct or Ask-First permission).